|
| Home >
Tenders / Notices |
| Tenders / Notices |
| Office |
Name of Work |
Last
Date |
|
HQ, ASI |
-
EOI for the appointment/engagement of 3 Consultant
-
Inviting Technical and Financial bid (Two-bid system) for editing, arranging photographs & drawings, pre-press work including composing, proof-reading, printing, binding, supply of Reports on Turn-Key basis – reg
- Request for Proposal For establishing e-Governance Systems
- Limited Tender for Award of Comprehensive Maintenance of one year contract for Big and Small size Hot and Cold R.O. System In Installed of ASI,Hqrs. Office-Reg
- AMC for the maintenance contract of Accord Digital EPABX/80 Lines/ Extensions Intercom System with 65 instruments, installed at ASI, Hqrs. Office, Janpath, New Delhi and 10 line instruments at Central Archaeology Library Office ASI, National Archives Building-Reagrding.
- Invitation of quotations for the housekeeping services for the office of D.G.(ASI) at JanPath and ASI Library at NAI Building at JanPath for 2012-13.
- Quotations for supply of Stores/Stationery Articles-Reg : ACRs Folder with Print
- Quotations for supply of Stores/Stationery Articles-Reg : Plastic Crates
- Quotations for supply of Stores/Stationery Articles-Reg : Fevric Sheet, Packing Machine, Marker Pen, Ink Camlin Marker Pen, Stapling Roll, Stapling Nut, Plastic Sutli, Glue Stick, Quick Fix, Duster
- Quotations for supply of Stores/Stationery Articles-Reg : Two Leather Bags for carrying files and documents.
- Issuance of Work Order for carrying out Structural Analysis of Main Entrance Gopura of Krishna Temple: regarding
- Quotations for supply of Stores/Stationery Articles-Reg : Packing Paper, Fabric Sheet, Thread(Roll), Paking Tape Brown(4"), Cello Tape(2"), etc.
- Quotations for the Purchase of furniture for Central Arch. Library-Reg.
- Quotations for the Purchase of Steel Rack-Reg.
- Quotations for the Purchase of IT items-Reg.
- Quotations for supply of Stores/Stationery Articles-Reg : Steel Trunk, Lock Harrison, Cotton Roll, Bubble Sheet etc.
- Quotations for supply of Stores/Stationery Articles-Reg : Sample of Curtains cloth and new materials etc.
- Quotations for supply of Stores/Stationery Articles-Reg : Glass (Good quality) cut glass for officers/VIP meetings/conferences, Katori(for vegetable), Spoon Steel, etc.
- Quotations for supply of Stores/Stationery Articles-Reg : Rubber bands(small & big size), Fevi quick tube, Sketch books, Grape book , etc.
- Sealed tenders are invited from registered placement agencies for providing 5 Stenographers, 24 Data Entry Operators, 2 Cooks and 3 Bearers on contract basis for a period of one year.
|
Within Ten Days from the issued date
Within 3 weeks from the issued date
3.00 P.M. on 07.12.2011
Opened at 3.30 P.M. on 05.12.2011 |
|
Kolkata Circle |
|
Sale 11.11.2011 application for tender 08.11.2011
Sale:10.01.2012
Submission:12.01.2012
Application for tender 06.01.2012
Sale:10.01.2012
Submission:12.01.2012
Application for tender 06.01.2012
Sale:23.01.2012
Submission:25.01.2012
Application for tender 23.01.2012
Sale:14.02.2012
Submission:16.02.2012
|
|
Goa Circle |
|
Tender opening: 09.11. 2011 Tender opening: 29.11. 2011 |
|
Raipur Circle |
- Laying apron all around the structure and cist stone flooring for approach pathway at newly excavated monastery near school at Sirpur
- Conservation of monastery wall,
consolidation and resetting of apron at newly excavated monastery near School, Sirpur
- p/f m.s. grill and cutting the
earth including leveling at SRP-16, Sirpur
- Constructing RR stone masonry
wall & p/f m.s. grill over the wall in staff quarter area at Deoboloda
- Construction of stone masonry wall
and drain at Rajiv Lochan temple at Rajim.
- Construction of boundary wall with
grill fixing at Ramchandra temple,Rajim.
- Cutting the earth, dismantling of
damaged drain and laying cist stone flooring at Rajiv Lochan temple, Rajim.
- Construction of toe wall with dry
stone pitching of the tank inside comples at Chandraditya temple at Barsoor.
- Construction of stone masonry wall
and p/f chain link at Laxman temple at Sirpur.
- Laying flag stone flooring, earth
cutting, filling the earth in low lying area & leveling at Bhairamdeo temple, Dantewada.
- Earth filling, RR stone masonry and
lying flag stone flooring at Danteshwari Devi temple, Dantewada.
- Filling low lying area around
near Rajivlochan temple, Rajim
- Conservation of priest house
and providing and laying apron at Shiva temple No. 2, Sirpur.
- EConstruction of remaining
portion of staff quarter near Rajiv Lochan temple, Rajim
- Construction of remaining
portion of store shed near Rajiv Lochan temple, Rajim
- Construction of store shed
within Ramachandra temple, Rajim
- Construction of remaining
portion of toilet block near Rajiv Lochan temple, Rajim
- Brick flooring all around the
Keshavnarayan temple at Sheorinarayan
- Construction of stone masonry drain
and resetting of old damaged flooring at Rajiv Lochan Mandir, Rajim
- Conservation of excavated remains
at Malhar
- Construction of compound wall and
grill fixing of Jagannath temple complex, Rajim
- Lifting, shifting of heavy stone
members and removal of un useful debris at Pataleshwar temple, Malhar
- Consolidation of plinth of Bisudariya
temple No.1 at Ratanpur Fort,Ratanpur
- Providing and constructing RR stone
masonry in dry pitching around the tank at Laxman temple,Sirpur
- Providing and fixing MS Grill over
the existing compound wall in front portion of Rajiv Lochan temple,Rajim
- Laying apron all around the temple
and pathway from temple to main temple at Shiva temple No.6 at Sirpur.
- Laying approach pathway at
Sitabaree temple, Rajim
- Conservation of Palace Complex at
Sirpur
- Construction of stone masonry for
pitching in the bank of Raikhera Tank to prevent erosion of soil at Sirpur
- Conservation work of
Keshavnarayan temple at Sheorinarayan.
- Conservation work of Laxman
temple at Sirpur
- Repairs to existing kitchen within
Rajiv Lochan temple, Rajim
- Laying flag stone flooring at
Mahadev temple, Tuman.
- Laying remaining portion of flag stone pathway at Ratanpur Fort,Ratanpur
- Construction of toe wall with stone pitching of eastern and southern side of tank at Ratanpur Fort, Ratanpur.
- Repairs of dwarf wall, providing and fixing M. S. Grill gate at Durga temple at Lapha
- Conservation work of Shiva temple at Gatora.
- Consolidation of fortification wall at Vihara Complex at Sirpur.
- laying apron all around and flooring inside the structure at SRP-16 at Sirpur
- C. stone flooring and cutting the undulated earth at SRP-22,Sirpur.
- Repairs of store shed at Rajiv Lochan
temple ,Rajim.
- Construction of toilet block at
Ratanpur Fort, Ratanpur.
|
Submission:3.11.2011 Opening:7.11.2011
Submission:21.11.2011 Opening:23.11.2011
Submission:21.11.2011 Opening:23.11.2011
Submission:21.11.2011 Opening:23.11.2011
Submission:22.11.2011 Opening:24.11.2011
Submission:22.11.2011 Opening:24.11.2011
Submission:22.11.2011 Opening:24.11.2011
Submission:28.11.2011 Opening:30.11.2011
Submission:28.11.2011 Opening:30.11.2011
Submission:28.11.2011 Opening:30.11.2011
Submission:28.11.2011 Opening:30.11.2011
Submission:09.12.2011 Opening:12.12.2011
Submission:09.12.2011 Opening:12.12.2011
Submission:09.12.2011 Opening:12.12.2011
Submission:09.12.2011 Opening:12.12.2011
Submission:09.12.2011 Opening:12.12.2011
Submission:09.12.2011 Opening:12.12.2011
Submission:19.12.2011 Opening:21.12.2011
Submission:19.12.2011 Opening:21.12.2011
Submission:19.12.2011 Opening:21.12.2011
Submission:19.12.2011 Opening:21.12.2011
Submission:19.12.2011 Opening:21.12.2011
Submission:04.01.2012 Opening:06.01.2012
Submission:04.01.2012 Opening:06.01.2012
Submission:04.01.2012 Opening:06.01.2012
Submission:04.01.2012 Opening:06.01.2012
Submission:04.01.2012 Opening:06.01.2012
Submission:04.01.2012 Opening:06.01.2012
Submission:04.01.2012 Opening:06.01.2012
Submission:19.01.2012 Opening:23.01.2012
Submission:19.01.2012 Opening:23.01.2012
Submission:19.01.2012 Opening:23.01.2012
Submission:19.01.2012 Opening:23.01.2012
Submission:23.01.2012 Opening:25.01.2012
Submission:23.01.2012 Opening:25.01.2012
Submission:23.01.2012 Opening:25.01.2012
Submission:23.01.2012 Opening:25.01.2012
Submission:23.01.2012 Opening:25.01.2012
Submission:23.01.2012 Opening:25.01.2012
Submission:23.01.2012 Opening:25.01.2012
Submission:01.02.2012 Opening:03.02.2012
Submission:01.02.2012 Opening:03.02.2012
|
|
Dharwad Circle |
|
02-11-2011
16-11-2011
16-11-2011
16-11-2011
09-02-2012
09-02-2012
13-02-2012
|
|
Vadodara Circle |
-
1. SA/R (NP) to Ashokan Rock Edicts at Junagadh
-
2. SA/R (NP) to Ashokan Rock Edicts at Junagadh
- 1. S/R (P) to Ancient Site at Kotada (chain link fencing), at Dholavira
- 2. S/R (P) to Ancient Site at Kotada (chain link fencing), at Dholavira
- 1. S/R(P) to Group of Hindu & Jaina Temples, at Pavagadh Hill, Dist – Godhra.
- 2. S/R(P) to Group of Hindu & Jaina Temples, at Pavagadh Hill, Dist – Godhra.
- 1. S/R (NP) to Hinglojimata Temple at Khandosan, Distt. Mehsana.
- 2. S/R (NP) to Hinglojimata Temple at Khandosan, Distt. Mehsana.
- 1. S/R(P) to Three Cells Complex, Champaner-Pavagadh, Dist – Godhra
- 2. SS/R(P) to Three Cells Complex, Champaner-Pavagadh, Dist – Godhra
- 1. S/R (P) to Mansar Talav & Shrines, Viramgam, Distt. Ahmedabad
- 2. S/R (P) to Mansar Talav & Shrines, Viramgam, Distt. Ahmedabad
- 1. S/R (P) to City Gate Complex at Champaner-Pavagadh, Distt. Godhra.
- 2. S/R (P) to City Gate Complex at Champaner-Pavagadh, Distt. Godhra.
- S/R (NP) to Magderu Temple, at Dhrasanvel, Distt Jamnagar.
- S/R (P) to Three Cells Complex at Champaner-Pavagadh, Distt. Panchmahals
|
Submission:7.11.2011 before-3.00P.M Opening:8.11.2011
Submission:7.11.2011 before-3.00P.M
Opening:8.11.2011
Submission:1.12.2011 before-3.00P.M Opening:2.12.2011
Submission:7.12.2011 before-3.00P.M Opening:8.12.2011
Submission:12.12.2011 before-3.00P.M Opening:13.12.2011
Submission:15.12.2011 before-3.00P.M Opening:16.12.2011
Submission:23.01.2012 before-3.00P.M Opening:24.01.2012
Submission:16.02.2012 before-3.00P.M Opening:17.02.2012
Submission:16.02.2012 before-3.00P.M Opening:17.02.2012
|
|
Patna Circle |
|
Submission:04.11.2011 Opening:04.11.2011
Submission:11.11.2011
Opening:11.11.2011
Submission:14.12.2011
Opening:14.12.2011
Submission:29.12.2011
Opening:29.12.2011
Submission:06.01.2012
Opening:06.01.2012
Submission:09.01.2012
Opening:09.01.2012
Submission:08.02.2012
Opening:08.02.2012
Submission:21.02.2012
Opening:21.02.2012
Submission:21.02.2012
Opening:21.02.2012
|
|
Lucknow Circle |
- SR(PLAN) TO CHHOTA IMAMBARA(BACK
SIDE), LUCKNOW
- SR(PLAN) TO REPAIR TO BACK SIDE OF
NAUBAT KHANA (1ST PHASE), LUCKNOW
- SR(PLAN) TO RESTORATION OF INNER
GATEWAY OF AMJAD ALI SHAH’S MAUSOLEUM, LUCKNOW
- SR(PLAN) TO CONSTRUCTION OF
BOUNDARY WALL AROUND SITE MUSEUM AT PIPRAHWA DISTRICT SIDDHARTH NAGAR
- SR(NON-PLAN) TO PROVIDING AND FIXING
OF BOUNDARY PILLARS CNB/PNB FOR PROHIBITED/REGULATED AREA OF MONUMENTS IN LUCKNOW DIVISION-I
- SR(NON-PLAN) TO PROVIDING AND FIXING
OF BOUNDARY PILLARS CNB/PNB FOR PROHIBITED/REGULATED AREA OF MONUMENTS IN LUCKNOW DIVISION-I
- OW(NP) TO REPAIR OF CONSERVATION
ASSISTANT’S OFFICE AT NAUBAT KHANA,LUCKNOW
- SR(NON-PLAN) TO PROVIDING AND FIXING
OF BOUNDARY PILLARS CNB/PNB FOR PROHIBITED/REGULATED AREA OF MONUMENTS IN LUCKNOW DIVISION-I
- OW(PLAN) TO PROVIDING PUBLIC
AMENITIES FOR VISITORS AT VARIOUS MONUMENTS IN LALITPUR SUB-CIRCLE, LALITPUR
- DEPOSIT WORK OF RESTORATION OF
ANCIENT SHIVA TEMPLE COMPLEX, BITHOOR, KANPUR
- DEPOSIT WORK TO SPECIAL REPAIR OF SHRI
KRISHNA TIKROO KI BARADARI AT BITHOOR, KANPUR
- DEPOSIT WORK TO SPECIAL REPAIR OF SHRI
KRISHNA TIKROO KI BARADARI AT BITHOOR, KANPUR
- DEPOSIT WORK OF RESTORATION OF
SHIVAJI MAHAL, BITHOOR, KANPUR
- SR(PLAN) TO REPAIR OF COMPOUND WALL
AT BACK/NORTH SIDE OF ANCIENT BRICK TEMPLE AT KANCHALIPUR, KANPUR
- SR(PLAN) TO PREPARATION OF DETAILED
PROJECT REPORT (D.P.R.) OF THE MONUMENTS IN LUCKNOW
- SR(PLAN) TO STRUCTURAL REPAIR OF BANI
NATH MAHADEV TEMPLE AT MAHET,SRAVASTI
- SR(PLAN) TO REPAIR OF PATHWAY FROM
BAILLIE GUARD WOODEN GATE TO MAZAR AT RESIDENCY, LUCKNOW
- SR(PLAN) TO REPAIR OF BARGAWAN
CEMETERY, LUCKNOW
- OW(PLAN) TO PROVIDING SHED AND STORE
ROOM FOR EPIGRAPHY BRANCH AT BAILLIE GUARD COTTAGE AT LUCKNOW
- SR(PLAN) TO REPAIR OF GENERAL WALI
KOTHI(GF), LUCKNOW
- OW(PLAN) TO PROVIDING VISITORS
BENCHES AT KHUSROBAGH, ALLAHABAD
- SR(NON-PLAN) TO PROVIDING PATHWAY IN
KARBALA NASIR-UD-DIN HAIDER, LUCKNOW
- SR(PLAN) TO SPECIAL REPAIR OF DILKUSHA
PALACE, LUCKNOW
- SR(PLAN) TO STRUCTURAL REPAIR OF
FORTIFICATION WALL AND MAIN GATE AT VILAYTIBAGH, LUCKNOW
- SR(PLAN) TO CONSTRUCTION OF
BOUNDARY WALL AROUND SITE MUSEUM AT PIPRAHWA DISTRICT SIDDHARTH NAGAR
- SR(PLAN) TO PROVIDING FLOORING OF
CELLS & COURTYARD OF BIG PALACE GANWARIYA DISTRICT SIDDHARTH NAGAR
- SR(NON-PLAN) TO PROVIDING M. S. GRILL
RAILING AROUND PAKKI KUTI, MAHET, SRAVASTI
|
Sale:22-11-2011
Opening:24-11-2011
Sale:22-11-2011
Opening:24-11-2011
Sale:22-11-2011
Opening:24-11-2011
Sale:22-11-2011
Opening:24-11-2011
Sale:26-11-2011
Opening:28-11-2011
Sale:26-11-2011
Opening:28-11-2011
Sale:26-11-2011
Opening:28-11-2011
Sale:09-12-2011
Opening:12-12-2011
Sale:09-12-2011
Opening:12-12-2011
Sale:09-12-2011
Opening:12-12-2011
Sale:09-12-2011
Opening:12-12-2011
Sale:09-12-2011
Opening:13-12-2011
Sale:17-12-2011
Opening:20-12-2011
Sale:28-12-2011
Opening:30-12-2011
Sale:28-12-2011
Opening:30-12-2011
Sale:28-12-2011
Opening:30-12-2011
Sale:17-01-2012
Opening:19-01-2012
Sale:17-01-2012
Opening:19-01-2012
Sale:17-01-2012
Opening:19-01-2012
Sale:17-01-2012
Opening:19-01-2012
Sale:17-01-2012
Opening:19-01-2012
Sale:23-01-2012
Opening:25-01-2012
Sale:28-01-2012
Opening:30-01-2012
Sale:28-01-2012
Opening:30-01-2012
Sale:28-01-2012
Opening:30-01-2012
Sale:28-01-2012
Opening:30-01-2012
Sale:28-01-2012
Opening:30-01-2012
|
| Dehradun Circle |
|
Sale:07.12.2011 Submission:08.12.2011
Sale:04.1.2012 Submission:05.1.2012
Sale:03.1.2012 Submission:04.1.2012
Sale:04.1.2012 Submission:05.1.2012
|
| Guwahati Circle |
|
Sale:02.12.2011 Submission:05.12.2011
Submission&Opening:05.12.2011
Submission&Opening:13.12.2011
Sale:09.01.2012 Submission:11.01.2012
Sale:10.01.2012 Submission:12.01.2012
Sale:20.01.2012 Submission:23.01.2012
Sale:20.01.2012 Submission:23.01.2012
Sale:20.01.2012 Submission:23.01.2012
Sale:10.02.2012 Submission:13.02.2012
Sale:10.02.2012 Submission:13.02.2012
Sale:14.02.2012 Submission:16.02.2012
|
| Chennai Circle |
- AR & M to Dolotsava Mandapa, Mamallapuram
- AR&M to St.George Fort and Rampart Walls, Chennai
- OW(P) to Repairs to the Existing Toilet Block No.XXXVI/2 (Fort Museum), Chennai
- OW(P) to Upgradation of Visitors Toilet Block – Rock Cut Cave at Narasamangalam
- 1. SR(P) to Clive’s Building, Chennai.
- 2. SR(P) to Clive’s Building, Chennai.
- AR & M to Block No. XXXVI/2 (Fort Museum), Chennai
- AR & M to Pondicherry Gate, Gingee
- AR&M to Rock Cut Siva Temple (Kadambarkoil), Narthamalai
- AR&M to Pondicherry Gate, Gingee
- Construction of visitors toilet block – Sri Muruganathaswamy Temple, Thirumuruganpoondi
- AOW(P) to Structural Repairs to the Range Office Building at Mamallapuram
- SR(P) to Apathsahayesvara Temple, Sendhamangalam
- OW(P) to Upgradation of Visitors Toilet Block – Rock Cut Cave at Narasamangalam
- AR&M to Maintenance of Electrical Installations at Clive’s Building, Chennai
- Construction of visitors toilet block, Shore Temple, Mamallapuram under NCF
- OW(NP) to Maintenance of Group ‘C’ & ‘D’ Quarters at Mamallapuram
- AR&M to Sikkanathaswamy Temple, Kudumianmalai
- Making and supplying of M.S. grill fence including construction of R.R. Masonry Dwarf wall for the work of Venkatesa Perumal Temple, Thirumukkudal.
|
Sale:07.12.2011 Submission:09.12.2011
Sale:12.12.2011 Submission:15.12.2011
Sale:12.12.2011 Submission:15.12.2011
Sale:12.12.2011 Submission:14.12.2011
Sale:14.12.2011 Submission:16.12.2011
Sale:20.12.2011 Submission:22.12.2011
Sale:21.12.2011 Submission:23.12.2011
Sale:27.12.2011 Submission:29.12.2011
Sale:09.1.2012 Submission:11.1.2012
Sale:09.1.2012 Submission:11.1.2012
Sale:18.1.2012 Submission:20.1.2012
Sale:18.1.2012 Submission:20.1.2012
Sale:23.1.2012 Submission:25.1.2012
Sale:18.1.2012 Submission:20.1.2012
Sale:27.1.2012 Submission:31.1.2012
Sale:27.1.2012 Submission:31.1.2012
Sale:27.1.2012 Submission:31.1.2012
Received up to 3.00 p.m. on 16.02.2012
|
| Bangalore Circle |
|
Sale:07.12.2011 Opening:09.12.2011 |
| Srinagar Circle |
- S/R to Pari Mahal,
District Srinagar
- S/R to Ancient temple
at Naranag, District Ganderbal
- S/R to Avantiswamin
temple Avantipur, District Pulwama
- S/R to Mosque at
Wular Lake, District Bandipora
- S/R to Mughal Arcade
at Verinag, District Anantnag
- S/R to Akhoon Mulla
Shah Mosque, District Srinagar
- S/R to Avantisvara
temple Avantipur, District Pulwama
- S/R to Ancient Stupa,
Monastery & Chaitya at Parihaspora, District Baramulla
- Providing of Toilet
Block at Shankracharya temple, District Srinagar
- S/R to Sun Temple Martand, District Anantnag
- S/R to Buddhist Site at Harwan, District Srinagar
- S/R to Khanpur Sarai, Khanpur, District Srinagar
- S/R to Shiva Temple Ladhuv, District Pulwama
- S/R to Ancient Temple Kakpora, District Pulwama
- A/R to Devi Bhagwati temple Manwal, District Udhampur
- S/R to Shankracharya temple, District Srinagar
- S/R to Group of temples at Naranag, District Ganderbal
- S/R to Ancient site Ambaran (Akhnoor), District Jammu
- Extension of Office Room at Sugandesha temple Pattan, District Baramulla
- Maintenance of Guest House at Devi Bhagwati temple Manwal, District Udhampur
|
Submission&Opening:27.12.2011
Submission&Opening:27.12.2011
Submission&Opening:27.12.2011
Submission&Opening:27.12.2011
Submission&Opening:27.12.2011
Submission&Opening:27.12.2011
Submission&Opening:27.12.2011
Submission&Opening:27.12.2011
Submission&Opening:27.12.2011
Submission&Opening:12.01.2012
Submission&Opening:12.01.2012
Submission&Opening:12.01.2012
Submission&Opening:12.01.2012
Submission&Opening:12.01.2012
Submission&Opening:12.01.2012
Submission&Opening:12.01.2012
Submission&Opening:12.01.2012
Submission&Opening:1.02.2012
Submission&Opening:1.02.2012
Submission&Opening:1.02.2012
|
| Hyderabad Circle |
- Construction of Temporary Shed as per specifications and directed by the site in charge for OW (P) Construction of Temporary shed at Abdul Wahab
Khan tomb at Kurnool, Kurnool dist
- Providing tiles path way with safari stone slabs of size 0.60x0.60 mts and 20 mm thick matching texture of outside monument. To OW(P)Construction of toilet block and development of environs at Konda Reddy Burz at Kurnool, Kurnool District
- Laying Cement Concrete in 1:2:4 with 20 mm HBG Metal for parking area etc. for CDW for persons with Disabilities to Rock cut caves on hill top at Guntuplli W.G.Dist
- Supply of HBG metal 40mm and gravel,
including transportation, loading, unloading and all taxes etc. for CDW-Temple -8, Removal of Kameswara Temple for Reconstruction in Ramappa Temple premises at Palampet, Warangal Dist. all as per the specifications and as directed by the site in charge.
- Supply of Hard Granite Stone blocks for pillars and beams of Kalynamandapa of T.P.Temple of various sizes, as in the enclosed drawings from the approved
quarry of the suitable dimensions, cut in to required sizes and neatly ashlar fine dressed, finishes with palminy including loading, unloading, transportation and necessary taxes etc, and as per the specifications and directed by Engineer incharge
- Supply of good qualityof materials like Kankar lime stone , River Sand, Brick aggregate , Karakai and Jaggery etc for SR(P) Reconstruction of Kalyana mandapa of T.P. Temple at Hanumakonda Warangal Dist
- Supply of material like River Sand, 20mm Coarse Aggregate and Mosaic Tiles for CDW Providing Tiled pathway in Swayambhuva Temple Complex for persons with Disabilities (PWDS) at Warangal Fort, Warangal District.
|
Closing:27.12.2011 Opening:29.12.2011
Closing:27.12.2011 Opening:29.12.2011
Closing:27.12.2011 Opening:29.12.2011
Sale:09.01.2012 Opening:11.01.2012
Sale:09.01.2012 Opening:11.01.2012
Sale:09.01.2012 Opening:11.01.2012
Sale:01.02.2012 Opening:03.02.2012
|
| Agra Circle |
|
Sale:13.1.2012 Submission:16.1.2012
|
| Bhubaneswar Circle |
|
Sale:17.02.2012 Upto 2 P.M.
Receipt:20.02.12 Upto 3 P.M.
Opening:20.02.12 Upto 3.30 P.M
|
|
|
 |
|
 |